Mediterranean
Infrastructure & Cloud
Medusa Lands in Algeria: The 480 Tbps Mediterranean Backbone Arrives
ALGERIATECH Editorial
April 19, 2026
โก Key Takeaways The Medusa subsea cable โ 8,760 km, 24 fibre pairs at 20 Tbps each, 480 Tbps total...
Infrastructure & Cloud
The Medusa Submarine Cable: How a EUR 342 Million Mediterranean Mega-Project Is Reshaping Algeria’s Connectivity
ALGERIATECH Editorial
March 19, 2026
โก Key Takeaways The Medusa submarine cable system โ over 8,700 km, 24 fiber pairs, 480 Tbps total capacity, backed...