AFR-IX Telecom
Infrastructure & Cloud
Medusa Subsea Cable: Algeria’s International Bandwidth Upgrade and What It Means for Cloud
ALGERIATECH Editorial
May 23, 2026
⚡ Key Takeaways The Medusa submarine cable — 8,760 km, €342 million, 480 Tbps capacity, Nokia-powered — connects Algeria at...
Infrastructure & Cloud
The Medusa Submarine Cable: How a EUR 342 Million Mediterranean Mega-Project Is Reshaping Algeria’s Connectivity
ALGERIATECH Editorial
March 19, 2026
⚡ Key Takeaways The Medusa submarine cable system — over 8,700 km, 24 fiber pairs, 480 Tbps total capacity, backed...